Context

CS Group responsabilities for Support for soil operations of the Helios 2A / 2B post maintenance center are as follows:

  • Strengthen CNES teams, maintain CMPs in operational conditions, comply with operational constraints

Main Picture

The features are as follows:

  • **Exploitation of CMP **, namely :
  • 24 -hour soil penalty: Conf exploitation monitoring. hardware and software
  • Monitoring of installations, guarantee of the integrity of software
  • Participation in operational meetings
  • Supports at the tests of the team, mission, orbito teams **Technical management of subsystems ** (STS, Dutch, CGCU, EGM, OMGS, FOS/ARPE, CCS, …), namely :
  • Software monitoring with regard to the industrial resp. maintenance
  • Validation of new versions
  • Support for on -call duty if software problems
  • Preparation for CNES software monitoring commissions

Project implementation

The project objectives are as follows:

  • Ensure operations for the operating floor service for positions to post Helios satellites as a delegation of tasks
  • MCO (Maintaining operational conditions) of the Middle Sol used to ensure the operations of satellites in the Helios sector

The processes for carrying out the project are:

  • V Cycle

Technical characteristics

The solution key points are as follows:

  • Maintaining skills to ensure the MCO and support for operations over a very long period

The main technologies used in this project are:

Domain Technology(ies)
Hardware environment(s) HP-UX, PC
Operating System(s) Linux RedHat, Windows
Interoperability (protocols, format, APIs) BPD, FTP, VMWare
Production software (IDE, DEVOPS etc.) Testlink
Main COTS library(ies) CRYSPIS, NetBackup